Free · No obligation
A 30-minute CRA readiness walkthrough
A working session on your products, not a demo. We go through what Article 14 will ask of you from 11 September 2026 and where your gaps are. You leave with a gap list whether or not you ever use alloy-it.
What we cover
- 0–5
Your products, not our deck
What you place on the EU market, roughly how many releases are live, and how long you support them.
- 5–15
Where the September obligation actually bites
We walk your situation against Article 14: what you would have to produce within 24 hours today, and what you could not.
- 15–25
The gap list
Concretely what is missing: product records, release history, reporter identity, an owner for the clock. Usually shorter than teams expect.
- 25–30
What to do about it
Whether that is alloy-it, a spreadsheet, or something you already own. We will say so if the answer is not us.
Worth your time if
- You manufacture a product with digital elements sold in the EU
- Firmware, gateways, industrial or embedded devices
- Support periods measured in years, not months
- Someone has asked who owns CRA reporting and the answer was unclear
Probably not if
- You need CE marking or a notified body (we are neither)
- You want someone to file with ENISA on your behalf
- You are looking for a generic AppSec or container scanner
Request a slot
Tell us what you build and we will come back with two or three times, usually within one working day.
Would rather start on your own? Set up a product free →